ZerocoolAstra
Senior Member
software engineer problem la.. the software statement was written as "if level = 75% then send SMS".. instead of "if level > or = 75% then send SMS"... LOL
Or maybe the PUB engineer cant write specification properly.. or BOSS didn't pass down info correctly... LOL
But in getting from 20% (for example) to 100% level, wouldn't it pass 75% on the way? Still have time factor involved? Weird.