my place only scheduled for installation between jun-Aug 2012
my side is from Dec 2010 to Feb 2011.
Do not on the charges.
http://www.opennet.com.sg/network-rollout/fibre-me-up/summary-of-charges/
just go to their home page
http://www.opennet.com.sg/home/
and register. Look at the right hand side under "coverage". enter your postal code and fill in the rest of the info. They will send u letter if u being selected.
Thanks Peter.
My installation will take place on January 2010
How long did the installation take? After the installation, is it a must to sign up with them when the service is available?
it depends, they will tell u the installation need 1-3 hours, but the installation at my place only took abt 30 mins.
not sure about the service tho.